FRESHERS ( LEVEL -2 ) Q & A


technical interview questions for civil site engineer




For Experienced Engineer Interview Question scroll down 

Technical interview questions for civil site engineer

1. What is the Unit Weight of RCC?

 2500 kg/ m³

2. One Acre = ____________Sq. ft.

 43560 Sq. ft.

3. What is the Full Form of UTM?

 Universal Testing Machine 

4. One square meter = _________ Sq. ft?

 10.76 Sq. ft

5. One Hectare = _______Acres

  2.47  Acres

6. Maximum Free fall of concrete allowed is______?

1.5 m

7. A First Class Brick Should Absorb Water More than?

20 %

8. Number of Bricks used in 1 Cubic meter of Brickwork?

500 Nos.

9. List down the Ratio of Grades M5, M7.5, M10, M15, M20, M25, M30, M35, M40?

The grades are having the following ratios:

M5 – 1:5:10
M7.5 – 1:4:8
M10 – 1:3:6
M15 – 1:2:4
M20 – 1:1.5:3
M25 – 1:1:2

M30, M35, M40 – Design Mix Followed
10. What are the types of curing, what is membrane curing and what is the rate of application?

  • Types of curing are the follows:
  • Water curing.
  • Membrane curing.
  • Steam curing method.
  • Cold weather curing method.

11. What do you know about “TMT”?

TMT stands for “Thermo Mechanically Treated”. 




YESTERDAY JOBS

 INDIAN JOBS

Civil engineer jobs

Company NameLOCATIONAPPLY LINK
DESIGN ENGINEER JOBSINDIAApply
DRAFTSMAN JOBSINDIAApply
SITE ENGINEER JOBS INDIAApply

For Experienced Engineer Interview Question


12 What is BBS (Bar Bending Schedule)? 

The process of cutting and bending of steel rods or reinforcement recommended by the structural engineer is known as a bar bending schedule (BBS).

13. Why BBS is important? 

The main purpose of BBS is to clarify the location and
nature of steel rod in the structural member like a beam,
slab, column, stairs & Footing 

14. Standard Size of steel bars in RCC Work?

site engineer interview question


15. Grades of TMT steel? 

TMT bars are typically graded as Fe 415, Fe 500, Fe 550, Fe 600, etc. where the numbers indicate the level of stress that must be applied to deform it. 
For example, Fe 500 starts to deform when a pressure of 500 Newton/mm 2 is applied to it.

16. Different grades of steel Application of TMT Steel?

 Fe-415, Fe-500, Fe-550, and Fe-600 are the different grades of TMT Steel. 

Fe - 415: Due to its higher uniform elongation, it can be used in RCC Constructions in corrosion and as well as an earthquake-prone zone. 

Fe - 500: The high corrosion resistance, excellent bendability, and great resistance on dynamic loading of Fe - 500, it is used in RCC constructions in buildings, bridges, and other concrete structures. 

Fe - 550: It has similar properties of Fe - 500, but differs in yield and tensile strength. It is also used in RCC construction that is exposed to coastal, marine, or underground environments. 

Fe - 600: Since it provides better toughness and has more yield and tensile strength when compared to other TMT Steel grades, it is used for large RCC construction purposes

17. Why is steel used on concrete Structure? 

Concrete is strong in compression but weak in tension. This is the reason we place the steel in concrete. It allows the concrete to withstand tensile forces that would otherwise crack apart unreinforced concrete. Concrete is said to be reinforced when it contains a steel bar. The reinforcing bar must be totally encased in concrete to a minimum depth of 50mm or 2″ to prevent contact with water and prevent from rusting of the steel.

18. What is a clear cover? 

The clear cover is simply the small distance between the outside surface of concrete and the reinforcement. i.e. steel rod provided inside of that concrete structure. This clear cover for different structures depends upon the design of a structure and how much is its length, width, and load on the structure.

19. Types of Clear cover

1) Nominal Cover: It is the distance measured from the face of the member to the outermost face of the reinforcement including Stirrups or links. It is the dimension shown in drawings and detailing.

 2) Effective Clear cover: This is the distance measured from the face of the member to the centre of the area of the main reinforcement, which is tension or compression reinforcement. This is the dimension usually used for design calculations.

 Effective Cover = Clear cover + Also, 𝐷𝑖𝑎𝑚𝑒𝑡𝑒𝑟 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑙𝑖𝑛𝑘𝑠 + Effective Cover = Overall depth - effective depth. 1 2 x Dia. of main bars

20. Why is clear cover important? 

If I say you in one line, then it will be “clear cover is provided to make the RCC structure long-lasting". 

But let us discuss some of the importance of clear cover,

 It is provided to prevent steel rods inside the structure from corrosion due to weather and thermal effects. 

For example, in the case of a fire in the building, the metal begins to melt and lose its strength. So, the clear cover acts as an insulator and prevents melting. 

● Also in case of weather, it acts as a cover that does not let steel come in contact with the atmosphere and prevents it from corrosion. 

● It makes the bond between the steel and concrete which makes it capable of bearing compression as well as tensile force.

21 How much should be a clear cover of the structure? 

It depends on the types of structure but the minimum clear cover recommended for the different structures is given as, 

  • The minimum clear cover of the beam should be 25 mm and the column should be 40 mm. 
  • The minimum clear cover of the slab should be 15 mm. But, for safety rather than economical, we should provide 20 mm. 
  • The minimum clear cover for footing should be above 50 mm. because all the loads of superstructure are transferred to the ground through the footing. So, it should be more. 
  • The minimum clear of the column should be 40 mm.
  • The minimum clear cover for the raft foundation should be 75 mm.
  • The minimum clear cover for the staircase should be 15 mm.
  • The minimum clear cover for a retaining structure or retaining wall should be 20 mm.
technical interview questions for civil site engineer pdf
|technical interview questions for civil site engineer pdf download
|technical interview questions civil engineering
|technical interview questions for civil site engineer pdf
|technical questions for civil engineering
|technical interview questions for civil site engineer
|technical interview questions and answers for structural engineers pdf
|civil technical questions
|technical interview questions for civil engineer pdf
|civil technical interview questions
|civil technical questions with answers pdf
|technical questions in civil engineering
|civil engineering technical interview questions and answers pdf

                    
BOOK TITLEDOWNLOAD LINK
autoCad 2020 autocad bookLINK
ESTIMATION PROCEDURE SEPTIC TANKLINK
BASIC CIVIL ENGINEERING BOOK BY BHAVIKATI DOWNLOADLINK
Water tank design example download pdfLINK
THEORY AND PRACTICE OF PILE FOUNDATION BOOK DOWNLOADLINK
Staad pro manual download pdfLINK
cement mortar calculation for brickwork and plastering and steel QuantityLINK
Understanding Structural analysisLINK
Illustrated Design of RCC buildingsLINK
Calculation of Quantity of material for RCC cement sand aggregateLINK
AGGREMENT COPY BETWEEN CONTRACTOR AND CLIENTLINK
Existing building Stability check procedureLINK


COMMENTS

Name

_GENERAL STUDIES,3,Autocad,108,BANK,1,BOOK,58,brick,1,building material,4,Building Materials,1,cement,4,cement test,1,Civil,64,CIVIL ENG,93,CIVIL FACTS,1,CIVIL JOB VACANCY,79,COMMERCIAL,2,compresive strength,1,concrete,5,current affairs,4,E-BOOK,1,EAST,3,ELECTRICAL ENG,30,ENGINEER JOB VACANCY,163,ENGINEERING,53,ESTIMATION,15,EXAM NOTES,4,EXCEL,38,GOVT,45,HIGHWAY,2,HIGHWAY ENGINEERING,2,INTERVIEW QUESTION,3,JOB,128,JOB VACANCY,199,JOBS VACANCY,12,land measurement,1,MECH ENG,121,MECH RECRUITMENT,1,MEDICAL,3,NORTH FACING,2,notes,185,paint,5,POLICE,1,Private,12,Quiz,204,RCC,4,RESIDENTIAL,9,roof slab,3,SOFTWARE,5,soil mechanics,4,SOUTH,4,SPECIAL,3,STAAD,28,steel,2,Structural analysis,2,Structural drawing,36,tiles,2,weight of steel,1,
ltr
item
CIVIL WEBSITE: site engineer interview question | technical interview questions for civil site engineer
site engineer interview question | technical interview questions for civil site engineer
site engineer interview question | technical interview questions for civil site engineer|technical interview questions for civil site engineer pdf
https://blogger.googleusercontent.com/img/a/AVvXsEhIYa7NEzGzTDMzL5mlH2WAUb8XIkBIGKGbJWyu_HEqfDeJHydZZbR3buc5gF9UUWwJfdqAHmoaAEKhTziCMa3fYflE6IR8kS1fmmqNPETYZPCBHj4sMrgEtuQbwqJ8a6VlxV1XufPFsGhVqX4WAtajH-cezw3CMWAIsdGMSA9x8LA3hmODjL2UczcA=w640-h290
https://blogger.googleusercontent.com/img/a/AVvXsEhIYa7NEzGzTDMzL5mlH2WAUb8XIkBIGKGbJWyu_HEqfDeJHydZZbR3buc5gF9UUWwJfdqAHmoaAEKhTziCMa3fYflE6IR8kS1fmmqNPETYZPCBHj4sMrgEtuQbwqJ8a6VlxV1XufPFsGhVqX4WAtajH-cezw3CMWAIsdGMSA9x8LA3hmODjL2UczcA=s72-w640-c-h290
CIVIL WEBSITE
https://www.civilwebsite.com/2021/12/site-engineer-interview-question.html
https://www.civilwebsite.com/
https://www.civilwebsite.com/
https://www.civilwebsite.com/2021/12/site-engineer-interview-question.html
true
6778661338604217153
UTF-8
Loaded All Posts Not found any posts VIEW ALL Readmore Reply Cancel reply Delete By Home PAGES POSTS View All RECOMMENDED FOR YOU LABEL ARCHIVE SEARCH ALL POSTS Not found any post match with your request Back Home Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sun Mon Tue Wed Thu Fri Sat January February March April May June July August September October November December Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec just now 1 minute ago $$1$$ minutes ago 1 hour ago $$1$$ hours ago Yesterday $$1$$ days ago $$1$$ weeks ago more than 5 weeks ago Followers Follow THIS PREMIUM CONTENT IS LOCKED STEP 1: Share to a social network STEP 2: Click the link on your social network Copy All Code Select All Code All codes were copied to your clipboard Can not copy the codes / texts, please press [CTRL]+[C] (or CMD+C with Mac) to copy Table of Content