INTRODUCTION -Quantities of materials
- Brick Masonry Work
- Block Masonry Work
- Concrete Work
- Plaster Work
- Tile Work
CONCRETE WORK
Providing and laying cement concrete of specified grade excluding the cost of centring and shuttering.- All work up to plinth level -1:5:10 (1 cement:5coarse sand: 10 graded stone aggregate 40mm nominal size)
REINFORCED CONCRETE WORK
Centring and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.- Using steel sheets with M.S.frames
DOWNLOAD MATERIAL QUANTITY REPORT
CONCRETE WORK
Providing and laying cement concrete of specified grade excluding the cost of centring and shuttering.- All work up to plinth level -1:5:10 (1 cement:5coarse sand: 10 graded stone aggregate 40mm nominal size)
REINFORCED CONCRETE WORK
Centring and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.- Using steel sheets with M.S.frames
DOWNLOAD MATERIAL QUANTITY REPORT