SEPTIC TANK ESTIMATE IN EXCEL FILE DOWNLOAD
SEPTIC TANK ESTIMATE IN EXCEL FILE DOWNLOAD
SEPTIC TANK DETAILS
PLAN SIZE - 13'-0" X 5'-0"
DEPTH - 7'-0"
- Earth Work Excavation
- Filling
- P.C.C
- Reinforced Concrete Work
- Reinforcement
- Brick Work - 230mm:
- Plastering
- Manhole
DESCRIPTION
Reinforced Concrete Work:
R.C.C 1:1.5:3 mix using 20 mm stone jelly for roof slab, lintel, roof slab, lintel and sunshade excluding fabrication of RCC items and including cost and conveyance of all materials labor, etc.,
Reinforcement:
Reinforcement for R.C.C work including straightening, cutting, bending, placing in position & binding all TMT bars
Centering and Shuttering work:
Centering and shuttering including strutting, propping, etc. and removal o formwork for Cut lintel & roof
Earthwork:
Earthwork in excavation including disposal of the earth; disposed earth to be leveled and neatly dressed.
P.C.C:
P.C.C work: Providing and laying plain cement concrete of 1:5:10 (1cement: 5 coarse sand: 10 graded stone aggregate) including the cost of centering and shuttering.
Sand Filling:
Supplying and filling with river sand including watering, ramming, consolidating, and dressing.
CIVIL NOTES -CLICK HERE
RESIDENTIAL PLAN
#1 (40' x 80') - Click here
#2 (30' x 50') - Click here
#3 (30' x 24') - Click here
#4 (30' x 60') - Click here
#5 (30' x 70') - Click here
#6 (25' x 60') - Click here
#7 (20' x 60') - Click here
#8 (30' x 40') - Click here
COMMENTS