INTRODUCTION -RAMP ESTIMATE
This post cover about Ramp construction cost calculator for the building. we have uploaded the ramp estimate & construction cost calculator excel link below. A short description of that building is mentioned.
ITEM INCLUDED IN RAMP ESTIMATE
EARTHWORK
Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m All kinds of soil.
CONCRETE WORK
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering.- All work up to plinth level -1:5:10 (1 cement:5coarse sand: 10 graded stone aggregate 40mm nominal size)
REINFORCED CONCRETE WORK
Centring and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.- Using steel sheet with M.S.frames
DOWNLOAD RAMP ESTIMATE REPORT
ITEM INCLUDED IN RAMP ESTIMATE
EARTHWORK
Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m All kinds of soil.
CONCRETE WORK
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering.- All work up to plinth level -1:5:10 (1 cement:5coarse sand: 10 graded stone aggregate 40mm nominal size)
REINFORCED CONCRETE WORK
Centring and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.- Using steel sheet with M.S.frames
DOWNLOAD RAMP ESTIMATE REPORT